3901 E University Ave, Georgetown, TX 78626 Mon to Sat, 8:00 AM to 5:00 PM, Sun closed Licensed and insured
Line Marking in Georgetown, TX
Line Marking, 3 services

Line Marking in Georgetown, TX

Parking lot striping, accessible space marking and fire lane painting for commercial lots, HOAs, churches and schools in Georgetown and Williamson County.

Free written estimates Licensed and insured 5.0 rated on Google

Get a free estimate

Tell us what the pavement is doing. We call back the same business day.

Please tell us your name.
We need a number to reach you on.
Please enter a valid email.
A sentence is enough.

No spam, no pressure. Your details stay with us.

5.0 on GoogleRated by Georgetown customers
Written estimatesScope, price and timeline in writing
Licensed and insuredResidential and commercial
Built for TexasBase work for clay, heat and storms
Line Marking work in Georgetown
Licensed and insured, Georgetown TXOwn crews, written estimates, 5.0 on Google
Striping in Georgetown

One local crew for every striping job

Paint is the cheapest part of a parking lot and the first thing people notice. Faded stalls, a missing van space, a fire lane the marshal cannot read, all of it makes a property look tired and can put an owner on the wrong side of an inspection. TXST Paving Company handles line marking across Georgetown, from retail centers on Williams Drive to church lots in Serenada and HOA amenity parking in Sun City and Teravista.

This page covers the three marking services we run most often: full parking lot striping, ADA and Texas Accessibility Standards handicap space marking, and fire lane striping to the local fire marshal's spec. If you already know what you need, jump to the service page. If you are not sure, keep reading and call us at (737) 403-8619 for a free written estimate.

  • Parking Lot Striping: Crisp new layouts and restripes with traffic grade paint, stencils, arrows and stalls that line up.
  • Handicap Space Marking: Accessible and van accessible spaces, access aisles, signage and symbols laid out to ADA and TAS.
  • Fire Lane Striping: Red curb and lettered fire lanes that pass the fire marshal the first time.
Good to know

Line Marking in Georgetown, explained

What Line Marking Covers on a Georgetown Lot

Line marking is everything painted on pavement and curbs that tells drivers where to go, where to stop and where they cannot park. On a typical commercial lot in Georgetown that means:

We lay out new lots from a site plan and we restripe existing lots over the old pattern, or over a fresh sealcoat after it cures. Striping is also the last step on most of our parking lot paving and commercial lot sealcoating jobs, so one crew can handle the whole lot from base to paint.

Stall lines, single or hairpin, at 90, 60 or 45 degrees
Drive aisle arrows, stop bars, crosswalks and ONLY lettering
Accessible spaces, access aisles, the wheelchair symbol and post-mounted signs
Fire lanes with red curbs and FIRE LANE NO PARKING lettering
Curb painting in yellow for no parking, loading zones and pedestrian edges
Stencils for reserved, visitor, compact, EV charging, pickup and no parking areas
Speed bump and wheel stop striping so they are visible at night
Our Line Marking Services, Georgetown TX02

Our Line Marking Services

Parking Lot Striping

New layouts and restripes for retail, office, medical, church, school and multifamily lots. We size stalls for the way the lot is actually used, pick waterborne traffic paint or thermoplastic based on traffic and budget, and paint arrows, stop bars and curbs in the same visit. Read more on our parking lot striping page.

Handicap Space Marking

Accessible spaces laid out to the 2010 ADA Standards and the Texas Accessibility Standards: the right count for the lot size, van accessible spaces with 96 inch aisles, the symbol on a blue field, signs at the proper height and slopes checked before paint goes down. Details on our handicap space marking page.

Fire Lane Striping

Red curb and white lettering that meets what the Georgetown Fire Marshal and Williamson County inspectors expect, with tow away signage where the owner wants enforcement. Covered in full on our fire lane striping page.

Why Paint Fades So Fast in Central Texas, Georgetown TX03

Why Paint Fades So Fast in Central Texas

Line paint in Georgetown lives a hard life. Summer pavement temperatures pass 140 degrees, UV burns the resin out of the paint film, and the same sun oxidizes the asphalt underneath so the black fades to grey and the contrast drops even when the paint is still there. Add tire scrub at every entrance, sand and grit washed in by spring storms, and the occasional hard freeze, and a lot striped with a single coat of paint can look washed out in a year.

That is why we talk about sealcoating and striping together. A sealcoat gives you a dark, even surface so white and yellow lines pop, and it protects the asphalt from the same UV that kills the paint. We also choose materials by location on the lot: durable thermoplastic at entrances, crosswalks and stop bars where tires turn, standard traffic paint for stall lines that see less scrub.

East of I-35, on the Blackland Prairie clay around Westinghouse Road and out toward Hutto and Taylor, the pavement itself moves. Cracks that open with the clay break the paint line with them, so we usually do crack filling before we stripe. Paint over an open crack is money thrown at a problem that will be back next spring.

How to Choose the Right Marking Job

Owners usually come to us with one of four situations. Here is how we sort them out.

SituationWhat we recommendTypical timing
New asphalt or fresh sealcoat, no lines yetFull layout from plan, ADA spaces and fire lanes includedAfter the surface cures, about 30 days for new asphalt, 24 to 48 hours for sealcoat
Lines faded but layout worksRestripe over the existing pattern, refresh curbs, stencils and signsEvery 1 to 2 years for paint, 3 to 5 for thermoplastic
Failed inspection or ADA complaintTargeted ADA and fire lane corrections with slope check and signageAs soon as possible, usually one visit
Lot use changed, new tenant or more trafficRe-layout, blackout of old lines where needed, new counts and arrowsPlan around tenant move-in

One rule of thumb: if you can still see the old lines clearly enough to follow them and the layout has no compliance problems, a restripe is the right call. If the lines are gone, the count of accessible spaces is wrong, or you are converting from angled to 90 degree stalls, we lay it out fresh.

How a Line Marking Job Goes

Site walk and count.We measure the lot, count existing stalls, check the accessible space ratio and look at slopes where the ADA spaces sit.
Layout drawing.For new lots we work from the civil plan. For restripes we confirm the pattern and flag anything that will not pass inspection.
Surface prep.Blow and sweep, fill cracks that cross stall lines, and, if the lot is due, sealcoat first.
Layout and paint.Chalk lines, then striping machine passes with waterborne traffic paint or thermoplastic. Stencils, arrows, curbs and symbols go on the same day.
Signs and hardware.Post-mounted accessible and van accessible signs, fire lane and tow away signs, wheel stops where the plan calls for them.
Reopen.Paint dries to the touch in minutes in a Texas summer. We usually stage the work in halves so a busy lot never fully closes.
Who We Mark Lots For Around Georgetown, Georgetown TX06

Who We Mark Lots For Around Georgetown

Most of our striping calls come from property managers and owners of strip retail on Williams Drive and University Avenue, medical offices in Georgetown and Round Rock, churches, private schools, self storage and RV storage yards off SH 130, and HOA amenity centers in Wolf Ranch, Rancho Sienna and Santa Rita Ranch. We also stripe for apartment communities in Round Rock and Cedar Park, industrial yards in Hutto, and small town business districts out to Taylor, Jarrell and Liberty Hill.

Line marking pairs naturally with our other lot work. If your lot has potholes or alligator cracking, get that repaired before you spend money on paint. If you need a ramp poured or a curb cut so the accessible route actually works, our concrete crew handles handicap ramp installation. Speed bumps and wheel stops can be set and striped in the same visit.

How it works

From first call to finished surface

No mystery and no pressure. You know the scope and the price before a single truck shows up.

Call or text

Reach us at (737) 403-8619 and tell us what you have, a driveway, a parking lot or a private road.

On site measurement

We walk the pavement, measure it, check drainage and base condition and take photos of the problem areas.

Written estimate

You get a clear written estimate with options, usually within a day or two of the visit, free of charge.

The work

Our crew shows up when scheduled, does the job, explains cure times and leaves the site clean.

Reviews

What Georgetown property owners say

★★★★★ 5.0 on Google

★★★★★

“As a Realtor serving the Georgetown area, I'm careful about recommending local companies to my clients. TXST Paving has consistently been responsive, professional, and dependable, making the entire process straightforward from the initial conversation through completion.”

DL
Diane L.Realtor, Georgetown
★★★★★

“I recently used TXST Paving Company for patching and sealing my driveway. They did a really good job. It makes my customers feel safe getting into my shop. Thank you to the team for working hard even on the holiday!”

KA
Ka AdShop owner
★★★★★

“I've used Texas State Paving for the last several years, and each time expectations were met. Great company!”

JH
J HRepeat customer
FAQ

Line Marking questions, answered

How long after sealcoating can you stripe the lot?

In Georgetown summer heat a sealcoat is usually ready for paint in 24 to 48 hours. In cooler or humid weather we give it longer, because paint laid on a sealcoat that has not fully cured can lift or bleed. When we do both jobs, we schedule the striping crew to come back on the right day so you are not waiting on a second contractor.

Do you use paint or thermoplastic?

Both, and often on the same lot. Waterborne traffic paint is the standard for stall lines and restripes because it is economical and easy to refresh. Thermoplastic costs more but lasts several times longer, so we recommend it for entrances, stop bars, crosswalks and arrows where tires scrub the marking every day. We will lay out the options on your estimate.

Will my lot have to close while you stripe it?

Rarely all at once. We split most lots into halves or thirds and cone off one section at a time, so tenants and customers keep parking. Paint dries to the touch within minutes in warm weather. For very small lots or drive-thru lanes we coordinate a short window with the manager, often early in the morning before the business gets busy.

How many handicap spaces does my lot need?

It goes by total stall count. One accessible space for 1 to 25 stalls, two for 26 to 50, three for 51 to 75, four for 76 to 100, and so on. One of every six accessible spaces must be van accessible, so a lot with a single accessible space needs it to be a van space. Medical facilities have higher ratios. We count the lot during the site walk.

Who sets the fire lane requirements in Georgetown?

Inside the city, the Georgetown Fire Department's fire marshal enforces the fire code and reviews fire lane marking at inspection. Outside the city limits it is the Williamson County fire marshal and the local emergency services district. The common standard is a red curb with white FIRE LANE NO PARKING lettering repeated along the lane. We confirm the spec before painting a new lane.

New asphalt road through Texas Hill Country
Free written estimates

Not sure which of these you need?

That is what the free site visit is for. We look at the pavement and tell you what it actually needs.

Call TextFree estimate