
Parking Lot Paving in Georgetown, TX
New asphalt parking lots built from the dirt up for retail, office, church, school and storage properties across Georgetown, Round Rock and Williamson County.
Get a free estimate
Tell us what the pavement is doing. We call back the same business day.

Parking Lot Paving, done right for Georgetown ground and heat
A new parking lot is the first thing a customer, a tenant or a congregation touches on your property, and it is also the part most likely to get value engineered into an early failure. TXST Paving Company builds parking lots in Georgetown from subgrade to stripes, and we build them for the trucks that will actually use them, the storms that will actually hit them, and the clay that is actually under them.
We are licensed and insured, based on E University Ave, and 5.0-star rated on Google. Most of our new lot work is on commercial pads along Williams Drive, the I-35 frontage, the Westinghouse Rd corridor and the new retail going up in Round Rock, Hutto and Leander.
All our paving services
- Driveway Paving: Residential driveways, ranch drives and long private lanes paved in one to two days with a clean, sealed edge.
- Parking Lot Paving: New parking lots from subgrade to stripes, graded to drain and built for delivery trucks.
- Commercial Paving Contractor: One accountable contractor for property managers, developers and HOAs across Georgetown and Round Rock.
- Parking Lot Asphalt Contractor: Overlays, repairs, sealcoating and striping for existing lots, scheduled around your business hours.
Parking Lot Paving in Georgetown, explained
Where New Parking Lots Go Wrong in Williamson County
We get called to fix a lot of lots that are only five or six years old. The failures are almost always one of the same three.
None of these are hard to prevent. They just have to be in the design and in the bid.
02What Our Parking Lot Paving Includes
Site Work and Excavation
Clearing, cut and fill, and excavation to the design grades. We haul off spoil and bring in select fill where the plan calls for it.
Subgrade Preparation
Proof rolling to find soft spots, lime or cement stabilization on expansive clay, and moisture conditioning so the subgrade compacts to the right density.
Flexible Base
Crushed limestone base placed in lifts and compacted to spec. Typically 6 to 8 inches under stalls and 8 to 10 inches or more under truck lanes and loading zones.
Hot Mix Asphalt Paving
Laid with a paver and compacted hot. Usually 2 inches in stalls and 3 inches or a two-lift section in drive lanes, dumpster pads and fire lanes. Where the trash truck sits every week we usually recommend a concrete pad instead.
Curbs, Islands and Drainage
Concrete curb and gutter, landscape islands, ribbon curb, area inlets and swales so every square foot of the lot drains somewhere on purpose.
Striping, Signage and Accessibility
Layout and parking lot striping, accessible and van accessible spaces with signage to Texas Accessibility Standards and ADA, ramps, wheel stops, and fire lane striping to the Georgetown fire marshal's requirements.
03Designing for Georgetown Clay, Heat and Storms
West of I-35 the ground is limestone and caliche. It drains, it holds compaction, and a standard section works. East of I-35 you are on Blackland Prairie clay, and that changes the numbers. Expansive clay under a lot can move an inch or more between a dry September and a wet May. We deal with it by stabilizing the subgrade, running thicker base, and keeping water away from the edges with curb and gutter rather than a raw asphalt edge that the clay can pull away from.
Heat matters too. A black lot in July runs far hotter than the air, which softens the surface under a parked truck and speeds up UV oxidation. We use a mix that holds up in that heat and recommend a first sealcoat within the first year to lock in the surface.
And we grade for the storms, not for an average day. Real slopes, inlets sized for a Central Texas downpour, and no bird baths in the stalls.
Our Parking Lot Paving Process
Asphalt or Concrete for a New Lot?
Most Georgetown lots end up asphalt with concrete where the trucks stop. We do both, so we are not pushing one over the other. Our concrete contractor page covers the pads, curbs and approaches.
| Factor | Asphalt | Concrete |
|---|---|---|
| Up-front cost | Lower | Higher |
| Time to open | Usable within a day or two of paving | Typically a week of cure before traffic |
| Clay movement | Flexes, and can be overlaid later | Rigid, cracks and lifts at joints |
| Heavy truck areas | Thicker section, or a concrete pad | Good choice for dumpster pads and loading docks |
| Maintenance | Sealcoat every few years, easy patching | Less routine care, expensive to repair |
| Appearance | Black, striping stands out | Light grey, cooler surface |
06Who We Build Lots For and Where
Retail centers and restaurants, medical and office buildings, churches, private schools and daycares, self storage and RV storage yards, apartment communities, and HOA amenity centers. Georgetown first, including Wolf Ranch, the Williams Drive corridor, Westinghouse Rd and the SH 130 frontage, then Round Rock, Hutto, Pflugerville, Cedar Park, Leander, Liberty Hill, Taylor and Jarrell. If you need one contractor for a whole portfolio, see our commercial paving contractor page.
From first call to finished surface
No mystery and no pressure. You know the scope and the price before a single truck shows up.
Call or text
Reach us at (737) 403-8619 and tell us what you have, a driveway, a parking lot or a private road.
On site measurement
We walk the pavement, measure it, check drainage and base condition and take photos of the problem areas.
Written estimate
You get a clear written estimate with options, usually within a day or two of the visit, free of charge.
The work
Our crew shows up when scheduled, does the job, explains cure times and leaves the site clean.
“As a Realtor serving the Georgetown area, I'm careful about recommending local companies to my clients. TXST Paving has consistently been responsive, professional, and dependable, making the entire process straightforward from the initial conversation through completion.”
“I recently used TXST Paving Company for patching and sealing my driveway. They did a really good job. It makes my customers feel safe getting into my shop. Thank you to the team for working hard even on the holiday!”
“I've used Texas State Paving for the last several years, and each time expectations were met. Great company!”
Parking Lot Paving in Georgetown: your questions answered
How long does it take to build a new parking lot?
A small lot of 30 to 50 spaces on a prepared pad is often a one to two week job from excavation through striping, weather permitting. Larger lots, lots that need subgrade stabilization on clay, or sites with a lot of curb and drainage work take longer. We give you a schedule in the written estimate and update it if storms push things.
How thick should a commercial parking lot be?
Stalls are usually 2 inches of hot mix over 6 to 8 inches of compacted base. Drive lanes, dumpster pads and fire lanes get 3 inches or a two-lift section over 8 to 10 inches of base. On Blackland clay east of I-35 we stabilize the subgrade or add base. The lot should be designed by area, not one thickness everywhere.
Do you handle ADA and fire lane requirements?
Yes. We lay out accessible and van accessible spaces, signage and ramps to Texas Accessibility Standards and ADA, and stripe fire lanes with red curb and lettering the way the Georgetown fire marshal expects to see them. If your plans already call these out we follow them; if not, we help you get the count and placement right.
Do I need a permit to pave a new parking lot in Georgetown?
Most new commercial lots are part of a site development permit already handled by your engineer or general contractor. We build from the approved civil plans and coordinate inspections as part of the job. If you are adding a lot to an existing property without plans, we will help you figure out what the city needs before we start.
When should a new lot be sealcoated?
After the asphalt has cured, usually 6 to 12 months after paving, then every 2 to 3 years depending on sun exposure and traffic. Central Texas UV greys and hardens an unsealed lot fast, so the first coat matters more here than in cooler climates. We can put a sealcoat and crack seal schedule in your closeout package.
Work that pairs well with parking lot paving
01Driveway Paving
Residential driveways, ranch drives and long private lanes paved in one to two days with a clean, sealed edge.
Learn more
02Commercial Paving Contractor
One accountable contractor for property managers, developers and HOAs across Georgetown and Round Rock.
Learn more
03Parking Lot Asphalt Contractor
Overlays, repairs, sealcoating and striping for existing lots, scheduled around your business hours.
Learn more
Want a straight answer on parking lot paving?
Call or text and we will come out, measure and put a fair price in writing.
